Hot Mix Asphalt Calculator: Base and Surface Courses
A driveway is usually two courses, not one: a thicker base course and a thinner surface course, each with its own compacted thickness and density. Enter each layer and the calculator sums the volume and the tons, then divides the total into whole truckloads.
Layer by layerBase and surface coursesTruckloadsNo login
Calculator
4.14 tons56 ft³ at 148 lb/ft³ = 8,288 lb, or 3.76 t metric tons. Includes 5% waste, so order 56 ft³ = 2.07 yd³.
Area
320 ft²
Compacted thickness
2 in
Volume
56 ft³ = 2.07 yd³ = 1.5857 m³
Density
148 lb/ft³
Weight
8,288 lb
Short tons
4.14 tons
Metric tons
3.76 t
Includes a 5% waste allowance; the geometric volume is 53.33 ft³.
2 shape(s) added up — 4.14 tons.
Three pavements, stacked
Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.
A 600 ft² driveway, 3 in base + 2 in surface
4.14 tons
56 ft³ at 148 lb/ft³ = 8,288 lb, or 3.76 t metric tons. Includes 5% waste, so order 56 ft³ = 2.07 yd³.
The preset: 150 ft³ of base and 100 ft³ of surface is 250 ft³, which at 148 lb/ft³ is 37,000 lb, or 18.5 short tons.
A heavier section: 4 in base + 2 in surface
4.14 tons
56 ft³ at 148 lb/ft³ = 8,288 lb, or 3.76 t metric tons. Includes 5% waste, so order 56 ft³ = 2.07 yd³.
One more inch of base over the same area adds 50 ft³, which is 7,400 lb, or 3.7 short tons, so the order rises to 22.2 short tons.
The same two courses into truckloads
4.14 tons
56 ft³ at 148 lb/ft³ = 8,288 lb, or 3.76 t metric tons. Includes 5% waste, so order 56 ft³ = 2.07 yd³.
At 20 tons a truck, 18.5 short tons is one load with 18.5 tons on board; a 22.2 ton order is two loads, the second carrying 2.2 tons.
A driveway is usually two courses, not one
A hot mix asphalt driveway that is built to last is usually two layers of different mixes: a base course, which is thicker and coarser, and a surface course, which is thinner and finer and carries the finish. The two are specified separately, delivered separately and can carry different densities, so a calculation that treats the driveway as one thickness of one mix is an approximation rather than a takeoff.
The base course spreads the load and provides the body of the pavement; the surface course provides the wearing surface and the appearance. Because they are different mixes, their densities differ — a coarse base mix is often a little denser than a fine surface mix — and this calculator lets each layer carry its own density rather than forcing one figure on both.
Adding the layers is simple once each is measured: each layer is the area times its own compacted thickness, and the totals are summed. What the page adds beyond the arithmetic is the structure: a list of courses, each with a name, a thickness and a density, so the takeoff matches the way the job is specified rather than a single blended number.
Each course has its own thickness and density
The thickness of each course is a compacted thickness, the same as everywhere else on this site, and the densities are the in-place densities of each mix. The Asphalt Institute gives 142 to 148 pounds per cubic foot for an asphalt mixture in place, and the base and surface mixes usually sit within that band, but a mix design may give a more specific figure for each.
Because the tons are the volume times the density, the density matters most on the thickest layer. The base course is usually the thicker of the two, so an error in the base density costs more tons than the same error in the surface density. That is one reason to put the mix design figures in rather than leaving the defaults on a job that is being ordered seriously.
The total thickness is reported as well as the total tons, because the two together are what a contractor checks: a 5 inch section and an 18.5 ton order for a 600 ft² area should agree, and if they do not, one of the layer thicknesses or densities is wrong.
From tons to truckloads
Hot mix leaves the plant in trucks, and a plant and a crew think in loads as much as in tons. A load is a whole truck, so the tons are divided by the truck capacity and rounded up, and the last truck is the one that is not full. The page reports the number of loads, the number of full loads and the tons on the part load, so the delivery can be planned rather than guessed.
The capacity is an editable field because it varies with the truck and with the local weight limits. A tandem dump truck commonly carries around 16 to 20 tons of mix and a tri-axle more, but the legal limit, the truck and the plant all matter, so the default of 20 tons is an example rather than a rule. Ask the plant what a load is for your job.
Truckloads are also a reminder of why asphalt is a race against the clock: hot mix cools on the way and has to be placed and rolled while it is still workable. A job that needs several loads is planned so the paver is never waiting for mix, and the load count from this page is the number that planning starts from.
Questions this page answers
How many tons of hot mix asphalt do I need?
Measure each course separately: area times compacted thickness in feet gives cubic feet, times density gives pounds, divided by 2,000 gives short tons. Sum the courses. A 600 ft² driveway with a 3 in base and a 2 in surface at 148 lb/ft³ is 250 ft³, or 18.5 short tons.
How thick should the base and surface courses be?
It depends on the traffic, the subgrade and the design, and this page does not set a specification. A common residential section is 2 to 4 inches of base and 1½ to 2 inches of surface. The Asphalt Institute notes a half-inch nominal maximum mix should be placed at 1½ to 2 inches compacted.
How many tons does a truck of asphalt hold?
It varies with the truck and the legal weight limit. A tandem dump truck commonly carries around 16 to 20 tons and a tri-axle more. This page treats the capacity as an editable field, so enter the figure the plant gives you and the load count follows.
Can I pave a driveway in one layer instead of two?
A single layer is possible for a light-duty driveway, but a two-course section lets the base mix carry the load and the surface mix provide the finish and the density. If you do one layer, enter it as a single row with its own thickness and density.
Do the base and surface mixes have the same density?
Often close, but not always. A coarse base mix is frequently a little denser than a fine surface mix, and a mix design may specify different in-place densities for each. Each layer on this page carries its own density field for that reason.
Every figure on this site that is not arithmetic or an exact unit definition comes from one of these pages, read while this build was made on 2026-11-25. The asphalt density, the worked tonnage example, the seal-coat interval and the minimum compacted depth are quoted from the Asphalt Institute; the ton conversion is from NIST. Prices, lifespans, truck capacities and stockpile densities are labelled editable inputs, not quoted figures.
Asphalt Institute — Engineering FAQ — Read 2026-11-25. Density: "Asphalt Mixture typically weighs from 142 to 148 pounds per cubic foot (PCF) in-place. Use 148 PCF." Worked tonnage example: "10′ x 25′ x (4/12)′ = 83.3 cubic feet of HMA … 83.3 cubic feet x 148 PCF = 12328 pounds of mix = 12328 / 2000 tons = 6.1 tons". Seal coat: a new driveway or parking lot "should not require sealing for approximately 2 to 5 years – depending on severity of climate and quality of original work". Compacted depth: "a mix containing ½-inch NMS stone should be placed at a compacted depth of at least 1-½ to 2 inches".
NIST — Approximate Conversions from Metric to U.S. Customary Measures — Read 2026-11-25. The page gives "short ton (2000 lb) … 0.91 metric ton t" and "lb pound … 0.45 kilogram kg", the relations behind the short-ton to metric-ton column on every page here. The exact factors come from the definitions: 1 lb = 0.45359237 kg exactly, so 1 metric ton = 1000 / 0.45359237 = 2204.6226218 lb, and 1 short ton = 2000 lb = 0.90718474 metric ton.