Asphalt Price Calculator: Cost per Ton and per Square Foot
Enter the area, the compacted thickness and the prices you were quoted, and the calculator returns the tons, the material cost at the price per ton, the delivery fee, any minimum-charge top-up, and the delivered cost per ton and per square foot.
Price per tonDelivery and minimumCost per square footNo login
Calculator
$1,004.707.77 tons at $129.31 a ton delivered, $1.67 per ft². Material $854.70 plus delivery $150.00 and $0.00 minimum top-up.
Tons needed
7.77 tons
Material
$854.70 at the price per ton
Delivery
$150.00
Minimum top-up
$0.00
Delivered total
$1,004.70
Delivered cost per ton
$129.31
Cost per square foot
$1.67
Material priced for 600 ft² — 7.77 tons.
Three quotes, compared
Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.
600 ft² at 2 in, $110 a ton
$1,004.70
7.77 tons at $129.31 a ton delivered, $1.67 per ft². Material $854.70 plus delivery $150.00 and $0.00 minimum top-up.
The preset: 100 ft³ is 7.4 short tons. At $110 a ton that is $814 of material, plus $150 delivery, or $964 delivered, which is $1.61 a square foot.
A small job that meets the minimum
$500.00
2.59 tons at $193.05 a ton delivered, $2.50 per ft². Material $284.90 plus delivery $150.00 and $65.10 minimum top-up.
200 ft² at 2 in is 2.47 short tons, or $271.33 at $110 a ton. With a $350 minimum the top-up is $78.67, so the material bill is $350 before delivery.
A cheaper ton with a higher delivery
$1,138.15
7.77 tons at $146.48 a ton delivered, $1.90 per ft². Material $738.15 plus delivery $400.00 and $0.00 minimum top-up.
A plant further away may quote less per ton and charge more to deliver. At $95 a ton and $400 delivery the material is $703 and the total $1,103, which is more than the closer plant despite the lower rate.
The price per ton is not the price of the job
A quoted price per ton of asphalt is the price of the material at the plant, and nothing else. It does not include the delivery, which is a flat charge that has nothing to do with how much mix is on the truck. It does not include any minimum charge a supplier applies to a small load. And it is charged on the tons that are actually ordered, which are the calculated tons rounded to whatever the plant rounds to.
This page separates those pieces so the quote can be read the way an invoice will arrive. The material cost is the tons times the price per ton. The delivery is added as its own line. If the material and delivery together fall below a minimum you enter, the difference is added as a visible top-up. The result is the delivered cost, the delivered cost per ton and the cost per square foot of the area you are paving.
Reducing a quote to a cost per square foot is what makes two quotes comparable when they are written differently. A supplier who quotes a low price per ton but a high delivery may be more expensive overall than one who quotes a higher rate and delivers cheaply, and the per-square-foot figure is where that shows up.
Delivery, minimums and the part load
Delivery is charged by the trip, not by the ton, so its share of the bill falls as the job gets bigger. On a small job it can be a third of the total; on a large one it is a rounding error. That is the arithmetic behind the common advice to combine small paving jobs or to accept a supplier further away only when the load is large enough to spread the trip.
A minimum charge works the same way from the supplier's side: the plant and the truck cost the same to send whether the load is full or nearly empty, so a small load is charged a floor rather than the arithmetic. Modelling it as a top-up keeps it visible; a quote that simply inflates the price per ton for a small job hides the same charge in a number that looks wrong for the material.
The part load is worth naming as well. A plant may round the order up to a whole load or to a quarter ton, and the extra is mix you are billed for whether or not it is spread. This page prices the tons the calculation produced, so if your plant rounds, enter the rounded figure in the area or thickness until the tons match the ticket, or treat the difference as part of the waste allowance.
Comparing quotes on the same basis
The only honest way to compare two asphalt quotes is to reduce both to the same unit: a delivered cost per square foot for the same thickness, or a delivered cost per ton for the same job. This page produces both, so a quote written as a price per ton and a quote written as a price per square foot can be put side by side.
What the page cannot do is compare the material itself. Two quotes at the same price per ton may be for different mixes — a base mix and a surface mix, or mixes with different binder content — and a cheaper mix that has to be laid thicker is not cheaper. The price comparison is a starting point; the mix specification is what makes the two quotes comparable in the first place.
Every figure on the page is an editable example. Asphalt prices move with the oil price and with the season, and a regional price is not a national one. Enter the numbers you were actually quoted and the arithmetic will be right for them.
Questions this page answers
How much is a ton of asphalt?
It varies by region, by mix and by season, so this page does not quote a price. Enter the price per ton you were given, along with the delivery fee and any minimum, and the calculator returns the delivered cost per ton and per square foot.
How do I work out the cost per square foot of asphalt?
Divide the delivered cost by the area. The material is the tons times the price per ton, plus delivery and any minimum top-up. A 600 ft² driveway needing 7.4 tons at $110 a ton with $150 delivery is $964, or about $1.61 a square foot for the material.
Is a cheaper price per ton always the better quote?
No. Delivery is a flat charge, so a distant plant with a low rate can cost more overall than a closer one with a higher rate. Reduce both quotes to a delivered cost per square foot or per ton before deciding.
What is a minimum load charge for asphalt?
It is a floor on the bill for a small order, because the truck and plant cost almost the same to send whatever the load. The page adds the difference between the material subtotal and the minimum you enter as a visible top-up line.
Does the asphalt price include labour?
No. A price per ton is the material, and paving labour is charged separately, usually by the square foot or by the day. This page prices the material and its delivery; the driveway cost page adds labour and removal.
Every figure on this site that is not arithmetic or an exact unit definition comes from one of these pages, read while this build was made on 2026-11-25. The asphalt density, the worked tonnage example, the seal-coat interval and the minimum compacted depth are quoted from the Asphalt Institute; the ton conversion is from NIST. Prices, lifespans, truck capacities and stockpile densities are labelled editable inputs, not quoted figures.
Asphalt Institute — Engineering FAQ — Read 2026-11-25. Density: "Asphalt Mixture typically weighs from 142 to 148 pounds per cubic foot (PCF) in-place. Use 148 PCF." Worked tonnage example: "10′ x 25′ x (4/12)′ = 83.3 cubic feet of HMA … 83.3 cubic feet x 148 PCF = 12328 pounds of mix = 12328 / 2000 tons = 6.1 tons". Seal coat: a new driveway or parking lot "should not require sealing for approximately 2 to 5 years – depending on severity of climate and quality of original work". Compacted depth: "a mix containing ½-inch NMS stone should be placed at a compacted depth of at least 1-½ to 2 inches".
NIST — Approximate Conversions from Metric to U.S. Customary Measures — Read 2026-11-25. The page gives "short ton (2000 lb) … 0.91 metric ton t" and "lb pound … 0.45 kilogram kg", the relations behind the short-ton to metric-ton column on every page here. The exact factors come from the definitions: 1 lb = 0.45359237 kg exactly, so 1 metric ton = 1000 / 0.45359237 = 2204.6226218 lb, and 1 short ton = 2000 lb = 0.90718474 metric ton.