Asphalt arithmetic · area, tons and cost

Asphalt Driveway Cost Calculator: New, Overlay or Replace

Choose whether the job is new asphalt, an overlay over sound asphalt or a remove-and-replace, enter the area and the prices you would actually pay, and the calculator returns the tons of mix, the material bill with delivery and any minimum charge, the labour and removal, and the total cost per square foot.

New, overlay or replaceDelivery and minimum chargeLabour and removalNo login

Calculator

Units, density and allowance

The waste allowance is added to the volume before the tons are worked out.

Driveway and prices

Every price is an editable example, not a quote. The minimum is charged only when the material cost falls below it.

$1,904.70 7.77 tons, material $1,004.70 including delivery and any minimum, labour $900.00, removal $0.00. $3.17 per ft².
Tons needed
7.77 tons
Material
$854.70 at the price per ton
Delivery
$150.00
Minimum top-up
$0.00
Material bill
$1,004.70
Labour
$900.00
Removal
$0.00
Total
$1,904.70
Cost per square foot
$3.17
New driveway (base + surface) priced Total 7.77 tons. 600 ft² 2 in $1,904.70
New driveway (base + surface) priced — 7.77 tons.

Three jobs, priced

Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.

A new 600 ft² driveway, 2 in thick

$1,904.70

7.77 tons, material $1,004.70 including delivery and any minimum, labour $900.00, removal $0.00. $3.17 per ft².

The preset: 600 ft² at 2 in is 100 ft³, or 7.4 short tons at 148 lb/ft³. At the example $110 a ton, $150 delivery and $1.50 a square foot of labour, the total is about $1,864.

An overlay over the same area

$1,451.03

5.8275 tons, material $791.03 including delivery and any minimum, labour $660.00, removal $0.00. $2.42 per ft².

An overlay skips the base and the removal, so the labour is lower and there is no removal line. The mix is thinner, usually 1½ to 2 inches, which cuts the tons as well.

A small 200 ft² apron that meets the minimum

$800.00

2.59 tons, material $500.00 including delivery and any minimum, labour $300.00, removal $0.00. $4.00 per ft².

A small job is where the minimum charge bites. 200 ft² at 2 in is 2.47 short tons, which at $110 a ton is $271.33, below the $350 minimum, so a $78.67 top-up is charged before delivery.

Three jobs, three costs

The word paving covers three different jobs, and they cost differently. A new driveway is a base course and a surface course over prepared ground. An overlay is a new surface course laid over an existing asphalt driveway that is still sound, which skips the base and the removal. A remove-and-replace is the whole job again: the old surface is broken out and hauled away, the base is reworked, and both courses are laid.

The calculator is built around that choice because the choice changes every line. A new build and a replace both carry removal and base labour; an overlay carries neither, but it does carry the risk that the driveway underneath is not sound, which is why an honest overlay quote starts with a look at the existing surface rather than a measurement.

What the page does not do is decide which job you need. An overlay over a driveway that is cracked through or settling will crack again within a season, and a replace over a base that failed will fail again. The page prices the job you select; a contractor or an engineer decides which one is appropriate.

Why the minimum charge decides a small job

A hot mix plant and a paving crew cost almost the same to mobilise whether the job is two tons or twenty. That is why many suppliers and contractors apply a minimum charge: below a certain material bill, the price is the minimum rather than the arithmetic. On a small apron or a patch, that single line can be the largest part of the quote.

This page models the minimum as a top-up. The material cost is the tons times the price per ton; if that is below the minimum you enter, the difference is added as a top-up and shown as its own line, and the delivery is added on top of the topped-up bill. That way the minimum is visible rather than hidden inside a price per ton that looks high for a small job.

Delivery is the second flat charge and it behaves the same way: it does not scale with the tons, so it is a large fraction of a small job and a small fraction of a large one. Entering the delivery fee you were actually quoted, rather than an average, is what makes the per-square-foot figure at the bottom trustworthy.

The per-square-foot figure is the one to compare

Two quotes for the same driveway rarely break down the same way. One may quote a price per ton and a separate labour figure; another may quote a single price per square foot with everything in it. To compare them, both have to be reduced to the same basis, and the basis this page reports is the total cost divided by the square footage.

The page still shows every line, because the total alone hides what is being charged for. A quote that is low per ton but carries a large removal charge is not the same deal as one that is low per square foot with the removal included, and a reader who can see the labour and removal lines can tell which is which. The price per ton delivered is reported as well, so the material part can be compared on its own.

Every price on the page is an editable example, not a quote. Regional prices for asphalt move with the oil price and with the season, and the value of the page is the arithmetic it applies to the numbers you enter, not the numbers it ships with.

Questions this page answers

How much does an asphalt driveway cost?

It depends on the area, the thickness, the job type and the local price, so this page does not quote one. Enter the price per ton, the delivery fee, the labour rate and any removal you would pay, and the calculator returns the total and the cost per square foot.

Is an overlay cheaper than a new driveway?

Usually, because an overlay skips the removal and the base course and lays a thinner surface over the existing asphalt. It is only appropriate when the driveway underneath is sound, so the saving depends on the existing surface, not only on the price.

What is a minimum charge for asphalt?

It is a floor on the bill for a small job, because the plant and the crew cost almost the same to mobilise whether the load is two tons or twenty. This page adds the difference between the material subtotal and the minimum you enter as a visible top-up line.

How many tons does a driveway need?

Multiply the area in square feet by the compacted thickness in feet and by the density, then divide by 2,000. A 600 ft² driveway at 2 in is 100 ft³, which at 148 lb/ft³ is 14,800 lb, or 7.4 short tons.

Should the removal be priced separately?

Yes, because it is a real cost and it varies with what is being removed. A remove-and-replace breaks out and hauls away the old surface, while an overlay removes nothing. Enter a removal rate per square foot for a replace and zero for an overlay.

Related calculations on other sites

Put this calculator on your site

Embed this calculator

Copy the snippet into any page. The widget is free, needs no key and sends nothing until a visitor interacts with it.

Open widget view

Sources

Every figure on this site that is not arithmetic or an exact unit definition comes from one of these pages, read while this build was made on 2026-11-25. The asphalt density, the worked tonnage example, the seal-coat interval and the minimum compacted depth are quoted from the Asphalt Institute; the ton conversion is from NIST. Prices, lifespans, truck capacities and stockpile densities are labelled editable inputs, not quoted figures.