Asphalt Millings Calculator: Volume, Tons and Coverage
Millings are ordered loose and finish compacted, so the volume you buy is larger than the volume you drive on. Enter the area and the finished depth, and the calculator returns the compacted volume, the loose volume to order, and the tons at your stockpile density.
Loose and compacted volumeEditable stockpile densityCompaction factorNo login
Calculator
15.02 tons210 ft³ compacted, 273 ft³ loose to order (10.1111 yd³) at 110 lb/ft³ and a factor of 1.3.
Finished layer
210 ft³ = 7.7778 yd³
Loose to order
273 ft³ = 10.1111 yd³
Stockpile density
110 lb/ft³
Compaction factor
1.3
In-place density
143 lb/ft³
Weight
30,030 lb = 15.02 tons
Metric
13.62 t
600 ft² of millings at 4 in compacted — 15.02 tons.
Three millings jobs, measured
Every figure below is produced by the same engine that runs in the browser, at build time — so an example cannot drift from the calculator above.
A 600 ft² driveway, 4 in compacted
15.02 tons
210 ft³ compacted, 273 ft³ loose to order (10.1111 yd³) at 110 lb/ft³ and a factor of 1.3.
The preset: 600 ft² at 4 in is 200 ft³ compacted. At a compaction factor of 1.3 that is 260 ft³ loose, and at a stockpile density of 110 lb/ft³ it is 28,600 lb, or 14.3 short tons.
A 1,000 ft² lane, 6 in compacted
37.54 tons
525 ft³ compacted, 682.5 ft³ loose to order (25.2778 yd³) at 110 lb/ft³ and a factor of 1.3.
A thicker, longer lane: 1,000 ft² at 6 in is 500 ft³ compacted, 650 ft³ loose, and 71,500 lb at 110 lb/ft³, or 35.75 short tons.
The same 600 ft² at 2 in
7.51 tons
105 ft³ compacted, 136.5 ft³ loose to order (5.0556 yd³) at 110 lb/ft³ and a factor of 1.3.
A thin top dressing over an existing surface takes half the volume of the 4 in job: 100 ft³ compacted, 130 ft³ loose and 7.15 short tons.
What millings are and what they are not
Asphalt millings, also called reclaimed asphalt pavement or RAP, are the crushed material a milling machine lifts off an old asphalt road or lot. The aggregate and most of the binder are still there, which is why a compacted layer of millings can behave like a low-grade asphalt and why they are widely used for driveways, lanes and shoulders at a fraction of the cost of hot mix.
They are not hot mix. Millings are laid and rolled cold, they have no design strength, and they do not bind into a solid mat the way a plant mix does. They are also graded to whatever the milled road was, so the particle size varies from load to load. A driveway of millings is a good low-cost surface and a poor substitute for a properly designed and compacted hot mix pavement.
Because the material is variable, the two numbers that decide the order — the stockpile density and the compaction factor — are editable inputs here rather than fixed figures. Ask the supplier for the density of the stockpile you are buying from, and treat the default as a starting point to be replaced with a real number.
Loose volume, compacted volume and the compaction factor
Millings are delivered loose and rolled into a thinner, denser layer. That means there are two volumes for one job: the volume the material occupies in the truck and the stockpile, and the volume of the finished layer. The ratio between them is the compaction factor, and it is always greater than one because the loose material settles.
The calculation follows from that. The finished depth and the area give the compacted volume. Multiplying by the compaction factor gives the loose volume that has to be delivered. The loose volume times the loose stockpile density gives the weight, which is the number the supplier bills. Compaction changes the volume, not the mass: the same tons that arrive are the tons that stay, packed into a smaller space.
A compaction factor around 1.2 to 1.4 is common for millings, but it depends on the grading and the moisture as much as on the rolling, so it belongs in an input. If the finished layer comes out thinner than planned, the factor was underestimated; if the pile of loose material is much larger than the finished layer needs, it was overestimated.
Ordering millings by the ton or by the yard
A millings supplier may quote by the ton or by the cubic yard, and the two are connected by the stockpile density. Dividing the tons by the density gives cubic feet, and dividing again by 27 gives cubic yards. This page reports the loose volume in both cubic feet and cubic yards next to the tons, so a quote in either unit can be checked.
The in-place density is reported as well. It is the loose density multiplied by the compaction factor, and it is the density the finished layer ends up at. If a supplier quotes a price per compacted yard, the in-place density is the figure behind that quote, and comparing it with the loose density explains why the two prices are different.
The waste allowance applies here as it does everywhere on the site, and a millings job usually wants a little more than a hot mix job. Millings are spread and graded, some is lost at the edges, and the material is variable, so a margin of 10 percent is not unusual. The allowance is an input on the page.
Questions this page answers
How many tons of millings do I need?
Multiply the area by the finished depth in feet to get the compacted volume, multiply by the compaction factor to get the loose volume, then multiply by the loose stockpile density and divide by 2,000. A 600 ft² driveway at 4 in with a factor of 1.3 and 110 lb/ft³ is 260 ft³ loose, or 14.3 short tons.
What is the compaction factor for asphalt millings?
It is the loose volume divided by the compacted volume, and it is always above one. A value around 1.2 to 1.4 is common, but it depends on the grading, the moisture and the rolling, so this page treats it as an editable input rather than a fixed number.
How deep should millings be for a driveway?
It depends on the base and the traffic, and this page does not set a specification. A common choice is 4 to 6 inches compacted over a prepared base for a residential driveway. Enter the finished depth you want and the calculator returns the loose volume to order.
Are millings as good as hot mix asphalt?
No. Millings are laid cold, have no design strength and do not bind into a solid mat, so they suit a low-cost driveway, a lane or a shoulder rather than a designed pavement. They are a good value for the money and not a substitute for a plant mix.
How do I convert millings tons to cubic yards?
Divide the tons by the loose density in pounds per cubic foot and multiply by 2,000 to get cubic feet, then divide by 27. At 110 lb/ft³, 14.3 short tons is 28,600 lb, which is 260 ft³, or 9.63 cubic yards loose.
Every figure on this site that is not arithmetic or an exact unit definition comes from one of these pages, read while this build was made on 2026-11-25. The asphalt density, the worked tonnage example, the seal-coat interval and the minimum compacted depth are quoted from the Asphalt Institute; the ton conversion is from NIST. Prices, lifespans, truck capacities and stockpile densities are labelled editable inputs, not quoted figures.
Asphalt Institute — Engineering FAQ — Read 2026-11-25. Density: "Asphalt Mixture typically weighs from 142 to 148 pounds per cubic foot (PCF) in-place. Use 148 PCF." Worked tonnage example: "10′ x 25′ x (4/12)′ = 83.3 cubic feet of HMA … 83.3 cubic feet x 148 PCF = 12328 pounds of mix = 12328 / 2000 tons = 6.1 tons". Seal coat: a new driveway or parking lot "should not require sealing for approximately 2 to 5 years – depending on severity of climate and quality of original work". Compacted depth: "a mix containing ½-inch NMS stone should be placed at a compacted depth of at least 1-½ to 2 inches".
NIST — Approximate Conversions from Metric to U.S. Customary Measures — Read 2026-11-25. The page gives "short ton (2000 lb) … 0.91 metric ton t" and "lb pound … 0.45 kilogram kg", the relations behind the short-ton to metric-ton column on every page here. The exact factors come from the definitions: 1 lb = 0.45359237 kg exactly, so 1 metric ton = 1000 / 0.45359237 = 2204.6226218 lb, and 1 short ton = 2000 lb = 0.90718474 metric ton.